Sectors

Construction Machinery & Equipment Technologies

Tower cranesMade in Türkiye

Request a quote

Three technical axes

  1. 01

    Precision production

    Parts made for fit, wear and repeatability — so assemblies stay predictable.

  2. 02

    Reliable supply

    A supply chain that protects programme continuity for Espada sites and industry partners.

  3. 03

    Site-ready solutions

    Technology choices judged by field reality: safety, serviceability and lost-time reduction.

What we make

At our plant in Türkiye we make tower cranes and their spare parts — for our own sites and for the sector.

White flat-top tower crane standing on a construction site
  1. Tower cranes configured to each site’s height, reach and load needs.

  2. Lattice steel sections — consistent dimensions, controlled welds, interchangeable.

  3. The bearings, gears and gearboxes that carry the crane’s rotation — precision machined.

  4. Winch drums, wire rope, sheaves and hook blocks — for the safety of every lift.

  5. Operator cabins, electrical panels and control systems.

  6. Pins, bushes, sheaves and rollers — small parts that keep machines running.

From the workshop

How our tower cranes and spare parts take shape — from steel to the final check.

  • 01Mast & jib steelwork

    Welding

  • 02Gears & shafts

    CNC machining

  • 03Corrosion protection

    Paint line

  • 04Slewing unit & mechanisms

    Assembly

  • 05Tolerance & function

    Measurement & testing

  • 06Supply continuity

    Parts stock

How can we work together?

Choose what you need and see who carries each stage, from drawing to site.

  1. 01DefineCarried together
  2. 02MachineEspada carries it
  3. 03ValidateEspada carries it
  4. 04DeployCarried together

4 stages — who carries what

Espada
2
Together
2
You
0

We configure the crane with you — height, reach and load — then manufacture, test and deliver it, and set it up on site together.

Your role

You share the site needs and take part in set-up; manufacturing and testing stay with us.

From drawing to site

A controlled path so critical parts arrive fit for purpose — not almost right.

  1. 01

    Define

    Duty, interface and tolerance framed with the machine and the site programme.

  2. 02

    Machine

    Precision production with clear checks — geometry that holds under load and use.

  3. 03

    Validate

    Fit and function verified before the part becomes a site problem.

  4. 04

    Deploy

    Supply timed to maintenance windows and project pressure — continuity over noise.

Crane or part? Let’s talk

Start with three quick questions — we’ll shape the rest together.

Question 01 / 03

What do you need?